About the model.
In brief. HPE G2 Basic 3,6kVA (12) C13 WW PDU is a new basic single-phase power distribution unit rated at 3.6 kVA with 12 C13 outlets. It is installed in a rack and distributes power between HPE servers and other equipment. Suitable for server rooms and small racks.
What is in this configuration
- Type: PDU, Basic
- Power: 3.6 kVA
- Distribution: single-phase
- Outlets: 12 x C13
- Mounting: 0U/vertical and 1U/horizontal
- Dimensions: 44.35 x 5.30 x 4.15 cm
- Weight: 1 kg
- Brand: HPE
The unit is intended for those who need to route power neatly inside a rack: system administrators building or expanding a server room, and companies placing several HPE servers in one rack. The Basic model provides distribution without additional features, only load connection.
When choosing, compare the total consumption of the connected equipment with the 3.6 kVA rating and leave a margin. Also consider the number of connectors: one unit has 12 C13 outlets, so a dense rack or separate power feeds may require several PDUs.
Two mounting options help save space. In the 0U position the unit is mounted vertically and takes no rack units; in the 1U position it is mounted horizontally and takes one unit. The housing is compact, weight — 1 kg.
Servix terms. New equipment comes with a warranty of 12 months, service is provided by Servix. Free delivery within Tashkent, to the regions by arrangement. Unopened items can be returned within 10 days at our office. Made to order, lead time 2–3 weeks; the price is fixed in the invoice and includes 12% VAT. To get a quote, write to [email protected]: specify the model, quantity, company details and delivery address.
Questions and answers
What is the power rating and how many outlets does this PDU have?
Power — 3.6 kVA with single-phase distribution, 12 outlets, all C13.
How is the unit installed?
There are two options: 0U vertically or 1U horizontally in the rack.
Is this new equipment, and what is the warranty?
Yes, the equipment is new. Warranty — 12 months, serviced by Servix.
What is the lead time?
The unit is made to order, lead time 2–3 weeks; the price is fixed in the invoice.
Specifications
Other
- Brand
- HPE

Available to order, 2–3 weeks, Ships by December 7
Buy HPE G2 Basic 3,6kVA (12) C13 WW PDU
Condition: new.
HPE G2 Basic 3,6kVA (12) C13 WW PDU · new · invoice with 12% VAT
Installation and support — KP Solutions
Installation, setup and maintenance of equipment — from our integrator partner.
Similar products
Available to order, 2–3 weeks
HP 2m Mini-SAS Cable
HPE
up to 6 Gbps per lane · Mini-SAS 4x (SFF-8088) / Mini-SAS 4x (SFF-8088)
Available to order, 2–3 weeks


